Schematic Design: A Deeper Dive

Loading...
Del curso dictado por Universidad de Columbia
Construction Cost Estimating and Cost Control
372 ratings
Universidad de Columbia
372 ratings
Curso 3 de 4 en SpecializationConstruction Management
De la lección
Building the Estimate
James Sneath, Associate Director of Cost Management at Turner and Townsend, Inc., illustrates how to build an estimate. Sneath does a deep dive into a schematic design project.

Conoce a los instructores

  • Ibrahim Odeh, Ph.D., MBA
    Ibrahim Odeh, Ph.D., MBA
    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University
    Director of Research and Founder, Global Leaders in Construction Management