Insuring a Project Stays on Track

Loading...
Ver programa

Destrezas que aprenderás

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Revisiones

4.8 (803 calificaciones)
  • 5 stars
    638 ratings
  • 4 stars
    149 ratings
  • 3 stars
    11 ratings
  • 2 stars
    3 ratings
  • 1 star
    2 ratings
AY

Aug 11, 2018

Amazing course! I've learned a lot from Dr. Odeh and all the stuff are very skilled and have a lot of knowledge. Thank you so much for such a great Course.

EJ

Apr 20, 2019

I am challenging myself in ways I did not know was possible. This course, so far, has been inspirational for me both personally and professionally.

De la lección
The Role of the Scheduler in Construction Management
Jennifer Buermann, of the STV Group, discusses the role of the scheduler in a construction project and how to determine if a project is on track to meet the estimated goals. Also covered are ways to adjust to ensure the project stays on track.

Impartido por:

  • Ibrahim Odeh, Ph.D., MBA

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University