Introduction to Activity Precedence Diagrams

video-placeholder
Loading...
Ver programa

Destrezas que aprenderás

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Reseñas

4.8 (1,837 calificaciones)

  • 5 stars
    80,02 %
  • 4 stars
    17,31 %
  • 3 stars
    2,17 %
  • 2 stars
    0,32 %
  • 1 star
    0,16 %

GV

9 de sep. de 2020

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

T

10 de abr. de 2022

Excellent course with details. The Instructors are well equiped and has a lot of experience on the Industry. The only problem that i see is they didn't share the reading materials and ppt.

De la lección

Activity Precedence Diagrams

In this module, learners will create Activity Precedence Diagrams, also referred to as Activity on Node Diagrams, which graphically represent the construction activities in a project and their relationships.

Impartido por:

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University