LOB Example: Develop a Schedule

video-placeholder
Loading...
Ver programa

Destrezas que aprenderás

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Reseñas

4.8 (1,544 calificaciones)
  • 5 stars
    79,33 %
  • 4 stars
    18,13 %
  • 3 stars
    2 %
  • 2 stars
    0,32 %
  • 1 star
    0,19 %
VT
23 de dic. de 2019

This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.

LF
13 de may. de 2020

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

De la lección
Linear Construction Operations and Line of Balance
Professor Odeh introduces linear construction; projects that have linear, or repetitive, properties. Also covered is the Line of Balance scheduling method which is a way of allocating resources for repetitive processes.

Impartido por:

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University