Recommendations for Building AON Diagrams

Loading...
Ver programa

Destrezas que aprenderás

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Revisiones

4.8 (870 calificaciones)
  • 5 stars
    691 ratings
  • 4 stars
    161 ratings
  • 3 stars
    13 ratings
  • 2 stars
    3 ratings
  • 1 star
    2 ratings
BA

Mar 16, 2019

It was a very dynamic course which contained many useful knowledge. I gained many important information that will help me a lot.\n\nThanks to Coursera and to my Instructors.

AY

Aug 11, 2018

Amazing course! I've learned a lot from Dr. Odeh and all the stuff are very skilled and have a lot of knowledge. Thank you so much for such a great Course.

De la lección
Activity Precedence Diagrams
In this module, learners will create Activity Precedence Diagrams, also referred to as Activity on Node Diagrams, which graphically represent the construction activities in a project and their relationships.

Impartido por:

  • Ibrahim Odeh, Ph.D., MBA

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University