Design Estimate project

Loading...
Del curso dictado por Universidad de Columbia
Construction Cost Estimating and Cost Control
393 ratings
Universidad de Columbia
393 ratings
Curso 3 de 4 en SpecializationConstruction Management
De la lección
Building the Estimate
James Sneath, Associate Director of Cost Management at Turner and Townsend, Inc., illustrates how to build an estimate. Sneath does a deep dive into a schematic design project.

Conoce a los instructores

  • Ibrahim Odeh, Ph.D., MBA
    Ibrahim Odeh, Ph.D., MBA
    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University
    Director of Research and Founder, Global Leaders in Construction Management

Explora nuestro catálogo

Inscríbete de manera gratuita y obtén recomendaciones personalizadas, actualizaciones y ofertas.